No products in the cart.
Sale!
5kW Solar Ongrid System | Eligible for Solar Subsidy
₹230,335.00 (Inclusive of all Taxes)
Particulars | Description |
Inverter | GT-5-GXS1 – Pride |
Inverter Warranty | 10 Years |
Solar Panel | 575W TopCON DCR Bi-facial (Half-cut) Solar Panel x 6 |
Solar Module Product Warranty | 10 Years |
Solar Panel Performance Warranty | 27 Years |
Installation Materials | ACDB & DCDB Box Lightning Arrester Earthing Materials HDPE Conduit MC4 Connectors |
Description
The UTL 5kW Grid Tie Solar System generates 20-25 units of electricity per day, making it perfect for homes and small businesses. It comes with high efficiency ALMM approved solar panels with 27 years of linear output warranty and MPPT Ongrid inverter with 10 years onsite warranty. With excellent customer service and the best price in the market, it’s a cost-effective solution for reducing electricity bills while promoting clean, sustainable energy.
Unique Features of Ongrid Inverter
- Low Startup Voltage
- PV Overload Up to 30%
- DC switch available on above 4.2kW
- Wide AC Voltage Range (160V to 290V).
- Working Temperature Up to 65°C
- AC & DC Side Type-II 20kA SPD (Double Surge Protection)
- Less Noise Emission >25dB
- Remote Monitoring through UTL SOLAR App
- High MPPT Efficiency Up to 99%
- Power Export Limiting
- Easy Installation & Low Maintenance
Solar Kit items
Item No | Description of Items | Specification |
1 | SOLAR PV MODULE | 575W TopCON DCR Bi-facial (Half-cut) Solar Panel X 9 |
2 | UTL ON GRID INVERTER | UTL 5.3F1GT-GX |
3 | DCDB 1 IN 1OUT WITH SPD & FUSE | IP65 BOX, 20A DC Fuse for each string & (DC SPD II) 1000V |
4 | ACDB 5KW | 2 Pole 32 Amp MCB + AC SPD Type 2 + IP 65 Polycarbonate Enclosure |
5 | 2 FEET HDG STRUCTURE 80 MICRON MINIMUM | Designed for local wind (160Km/hr Maximum Speeds) and weather conditions |
6 | DC CABLE (Red & Black) | 1CX4 SQmm Cu. Flexible DC Cable |
7 | Inverter to ACDB (AC CABLE) | 2C*4 SQmm Cu. Flexible Cable |
8 | ACDB to LT PANEL (AC CABLE) | 2C*4 SQmm Cu. xlpe armoured cable |
9 | EARTHING ROD | GI earthing rod 2 mtr Length (50MM DIA) / Copper earthing rod 2 mtr Length rod (14MM DIA) |
10 | EARTHING CHEMICAL BAG | 25 kg earthing chemical bag |
11 | EARTHING CHAMBER | 300MM DIA |
12 | Earthing Cable for LA | 1C x 10 SQmm – Cu. Flexible Cable |
13 | Earthing Cable for DC & AC | 1C x 6 SQmm – Cu. Flexible Cable |
14 | Ring Type Thimble | 6SQMM |
15 | Ring Type Thimble | 10SQMM |
16 | PIN Type Thimble | 4 SQMM |
17 | PIN Type Thimble | 6 SQMM |
18 | SS304 Nut bolt with Washer | M8x30mm |
19 | HDPE Conduit (25 mm) | UV protected (25mm) |
20 | Elbow (25 mm) | UV protected (25mm) |
21 | T Bend (25 mm) | UV protected (25mm) |
22 | I bend (25 mm) | UV protected (25mm) |
23 | PU FOAM | PU foam bottle 750ml |
24 | Saddle | UV protected |
25 | Gitti | UV protected |
26 | Ferrul | Tube type ferrul |
27 | Screw | UV protected |
28 | Cable Tie – 300 | UV protected nylon Cable Tie |
29 | Danger Sign (AC+DC) | UV protector (UTL) |
30 | MC4 Connectors with pin | Solar Connector MC4 DC 1000V 30A IP67 Male-Female |
31 | Electrical Tape R,B,B,G | red-1, blue-1, black-1, green-1 |
32 | LA with HDG Stand | copper Bonded LA with 2 Mtr stand |
33 | Flexible Pipe | PVC Flexible Pipe 25mm |
Steps to Purchase
- Select the product variant that best meets your needs.
- Complete your order by making the payment based on the listed price.
- UTL Solar will connect you with an authorized Channel Partner for further assistance.
- The Channel Partner will request essential documents for verification.
- A convenient site visit will be arranged to assess your requirements.
- You will receive a detailed quotation covering installation charges, liaison fees, and any additional structural costs.
- The authorized Channel Partner will handle the installation with professionalism and care.
- Settle the installation and associated charges directly with the Channel Partner.
- Once the installation payment is complete, UTL Solar will promptly ship your product to your location.
Important Points to Remember
- Eligibility for subsidies will be subject to evaluation and approval.
- UTL Solar is responsible for the product only.
- UTL Solar will not be held accountable for installation services.
- Installation and maintenance services will be managed exclusively by the authorized Channel Partner.
- Structural and installation charges are not included in the listed product price.
Order Cancellation Policy
- Orders can be cancelled before the product is shipped.
- A site visit fee of Rs. 750 will be deducted from the refund amount.
- Once the product has been dispatched, cancellations will not be accepted.
Technical Specification
Specifications | Ratings |
Max. DC Input Power | 6.8kW |
MPPT Operating Range | 70V∼500V |
No. of MPPT Trackers | 1 |
Max Efficiency | 97.5% |
MPPT Efficiency | >99% |
Weight (Inverter) | 7.5 Kg |
Noise Emission | <35dB |
Recommended Load
Appliances | Average Consumption (Units/day) | Number of Hours per day | Total Units Consumed per day |
4 LED Bulbs | 0.06 | 8 hours | 2 |
2 Ceiling fans | 0.12 | 12 hours | 2.8 |
1 LED TV | 0.12 | 4 hours | 0.5 |
Washing Machine | 0.5-1.0 | 45 mins | 0.7 |
Refrigerator (286L) | 0.5 | 10 hours | 5 |
Window AC (1.5 Ton) | 2 | 4 hours | 8 |
Cooler | 0.3 | 6 hours | 1.8 |
Water Pump (1 HP) | 1 | 3 hours | 3 |
Subsidy Details
Cost of 5kW Solar System with Subsidy
The PM Surya Ghar: Muft Bijli Yojna is set to bring solar power to 1 crore homes, offering up to 300 units of free electricity per month. Here’s the updated rooftop solar price list for 5kW solar system with subsidy:
State | Total Subsidy Applicable |
Uttar Pradesh | ₹1,08,000 |
Gujarat | ₹78,000 |
Maharashtra | ₹78,000 |
Haryana | ₹78,000 |
3 Simple Steps to Claim Subsidy
- Submit your application online on the national portal of Rooftop Solar.
- Choose a suitable vendor.
- Wait till you get the applicable subsidy amount directly in your bank account.
Terms and Conditions
- Only residential solar panel systems are eligible.
- Only On grid and hybrid solar systems are eligible.
- No subsidy is applicable for systems larger than 10kW.
Note: The average consumption rate can vary depending upon the appliance’s specifications, power ratings, and brands.
FAQ
1. Is net metering mandatory for getting solar subsidy?
Yes, net metering is a critical requirement for an on-grid solar system to avail of the subsidy. It allows you to export surplus energy to the grid and earn credits, further reducing your electricity bills.
2. What documents are required to apply for subsidy under the PM Surya Ghar Muft Bijli Yojana?
You will need to provide the following documents:
- Proof of identity
- Proof of address
- Latest electricity bill
- Roof ownership certificate
3. What is the Solar Rooftop Scheme?
PM Surya Ghar Yojana is an initiative by the Indian government aimed at supplying free electricity to households through solar power. It is also called PM solar panel yojna which was officially launched by Prime Minister Narendra Modi on February 15, 2024. The scheme offers a subsidy to eligible households to install solar panel on their rooftops. This subsidy will cover up to 40% of the installation costs and is expected to result in the savings of approximately Rs. 75,000 crore annually for the government in electricity expenses.
4. What are the eligibility criteria for subsidy on a 5kW rooftop solar system?
To be eligible for solar panel subsidy, the following conditions must be met:
- The system must be installed at a residential or institutional property.
- The solar system should be grid-connected (on-grid) or hybrid.
- All components used must be approved by the Ministry of New and Renewable Energy (MNRE).
- Installation must be carried out by a vendor or installer empanelled under the state nodal agency.
5. Are there any restrictions on the size of the solar system for subsidy eligibility?
Yes, only systems with a capacity of up to 10kW are eligible for subsidies. No subsidy is provided for systems larger than 10kW.
6. How long does it take to receive the subsidy for a 5kW solar system?
After installation and successful inspection by the state nodal agency, the subsidy is usually disbursed directly to the installer, reducing the upfront cost for you. The entire process can take 1–3 months, depending on the state.
7. Are maintenance costs covered under the subsidy?
No, the subsidy only covers the initial installation cost. Maintenance costs, such as panel cleaning or inverter servicing, need to be borne by the consumer.
8. Can I install a 5kW solar system on my own and still avail of the subsidy?
No, self-installation does not qualify for subsidies. The system must be installed by an MNRE-authorized installer or an empanelled vendor like UTL Solar. You can select “Fujiyama Power Systems” under the vendor’s portal to choose UTL as your vendor.
Reviews
There are no reviews yet.